The Process

Phase 1

(Started May 14, 2018, cost $164,680)

The Mesa County Sheriff’s Office worked with architectural companies who specialize in building and designing correctional facilities to determine what the current and future needs are for the Mesa County Detention Facility.  After several months of work, a conceptual design was created that would meet our community’s needs while being good stewards of tax payer dollars. 

Phase 2

(Started Jan. 14, 2019, Cost $1,021,998)

During this phase, the architectural companies Blythe Group and DLR Group, will turn concept drawings into a shovel ready project. They will create blue prints for construction and determine the exact cost of the project. This phase is expected to take 8 months.

Phase 3

(Cost and length of project to be determined in Phase 2)

After Phase 2 is complete, the construction project will go before the Mesa County Board of Commissioners to approve and allocate funding. Construction is estimated to take approximately 18 months. Funding sources for the project are still being researched.

 

The Project

The goal is to expand the Mesa County Detention Facility to accommodate the increasing jail population to maintain a safe environment for inmates and staff as well as to more effectively and efficiently meet the medical and mental health care needs of the people in the facility’s care.

The Design 

Conceptual Drawing

The conceptual design is a multi-story building connected to the existing facility.  Its proposed location is on existing space originally designated for a possible expansion when the facility was first built in 1992.

The multi-story building will provide an additional 160 beds for inmates. The first floor will be a medical/mental health observation unit where medical and mental health services will be provided.  The next several floors will contain two sections of dormitory style housing containing 160 additional beds. Each housing unit will be two stories.

By building a multi-story building, room will be left for a future multi-story expansion adjacent to the proposed project. This will prevent or significantly delay having to build a new jail in the future if inmate population increases beyond capacity. The Mesa County Sheriff’s Office believes it is critically important to address our current needs while continuing to preserve space for future expansion.  

Why a Medical/Mental Health observation unit?

Currently, the Mesa County Detention Facility uses its booking area for a medical/mental health observation in addition to its designed purpose as an intake to the jail.  As the population increases, space for people who need closer observation and people entering the facility becomes challenging.

The proposed medical/mental health observation unit will provide closer monitoring and care to more effectively and efficiently meet medical and mental health care needs of the detention facility. This unit will include padded suicide prevention cells, negative air pressure cells designed to prevent the spread of air-borne illnesses, cells designed for persons with high medical needs, male and female multi-person detox cells, and transition cells designed to help integrate people recovering from a mental health episode back into general housing. Vehicles will have direct access to the medical/mental health observation unit allowing for emergency and non-emergency transport without effecting the rest of the facility.

This new unit has the potential to increase the level of medical services provided in the facility, whereas currently, the person needing care would have to be transported to the hospital.

Why expand the jail?

Simply put, more space is needed.  The Mesa County Detention Facility was originally designed with the capacity to house 392 inmates. We’ve remodeled and made adjustments to accommodate our expanding jail population. While these adjustments have increased the total number of beds to 611, it has not changed the footprint of the facility.

Over the last 4 years, the Mesa County Detention Facility’s population has steadily increased an average of 13.6% each year.  To put that into perspective, the average jail population in 2014 was 331, in 2018 it was 556.  On July 23, 2018, a high of 629 inmates were housed in the facility.

Our target population is less than 80% of the total number of inmates we can house. When at or under our target population, we're able to more effectively house the diverse classifications of inmates. For example, females cannot be housed together with males, and oftentimes co-defendants for a case cannot be housed together. For the safety and security of our inmates, it is our responsibly to house known violent inmates away from those who are not known to be violent. When our population rises above 80% of available bed space, it makes it difficult to appropriately house our different inmate populations.

With our current jail, the target population is 490. December 2017 is the last time the jail population was within our target. With the expansion, the target population will increase to approximately 618.  

How much will the expansion cost?

The cost of the project will depend on when construction begins (due to inflation) and is subject to fluctuations based on market conditions, beyond control. If construction were to begin today, the expansion is estimated to cost in excess of $20 million. Phase 2 includes continually updated cost estimations by a third party cost estimator.  

How will it be paid for?

Mesa County’s Sheriff, Board of County Commissioners and County Administrator are currently exploring and evaluating potential funding options. Some of the potential funding options require voter approval.   

When will construction begin?

We do not have an estimated start date yet. Ultimately, that will be determined by how and when we have secured funding for the project. Once started, construction is estimated to take approximately 18 months.

 